Watercare Services Ltd
Location: Auckland
Problem: Fabricate and install 600 NB (nominal bore) bypass in a 4-day window, then add a 6 m deep drainage sump.
Solution: Survey and model, then 3D detail the pipework. Generate shop drawings and fabricate, paint and assemble the pipe-work. Excavate the 6m sump and design temporary works to allow the pipe to be installed before the sump is backfilled. Plan the works every which way and go for it!